– Three stores provided ~44.75 hours of luminosity
– MI-60 upper bend power supply repaired
– Short down times caused by Linac power supply trips and Buncher trips
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts