Feb. 11-14

– Five stores provided ~40.5 hours of luminosity
– MiniBooNE frozen sump discharge line cleared
– Tevatron lost some luminosity due to an earthquake in Chile
– Store 8488 aborted. No cause was found
– ComEd power glitch caused the loss of store 8492, the stash, the stack, cryo systems, CDF equipment, the Pelletron and the failure of equipment throughout the accelerators
– MI safety system tripped off due to a ground fault indication

Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts