Feb. 18-21

– Six stores provided ~50.78 hours of luminosity
– Vacuum personnel fixed a vacuum leak on the Tevatron D17 collimators
– The antiproton source developed with water flow sensor
– On Monday morning Pbar personnel accessed and began repairs on two water leaks

The integrated luminosity for the period from Feb. 14-21 was 33.64 inverse picobarns. NuMI reported receiving 7.42E18 protons on target during this same period.

Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts