Feb. 7-9

– Three stores provided ~29.3 hours of luminosity
– MiniBooNE suffered three hours of downtime due to system problems
– Tevatron personnel conducted orbit kicker tests
– Interlock personnel conducted Meson Safety system tests
– Linac personnel repaired a RF station that suffered a power surge
– MI will be accessed today for 2-3 hours to make RF repairs

Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts