– Four stores provided ~47 hours of luminosity
– Linac personnel repaired a RF station (LRF4)
– The cryo system for Pbar’s stochastic cooling failed
– NuMI tripped off on a target LCW indication
– MI-8 suffered a power glitch that aborted the stash
– The glitch also caused MI main bus regulation problems
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts