– Six stores provided ~61.5 hours of luminosity
– The network storm disabled beam to T-987
– Cryo personnel repaired Tevatron sector B1 wet engine
– Controls personnel repaired the NuMI front end that was causing the network storms
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts