March 9-11

– The accelerator shut down due to continued ComEd work
– Personnel at the Central Utility Building rotated LCW pumps for maintenance work
– Water work personnel found and fixed a Main Injector leak
– Operators monitored the New Muon Lab’s cryo cavity coupler conditioning
– A cryo compressor in Tevatron F-sector tripped off
– Operators monitored the conditioning of the Tevatron separators
– Operations reported that the Tevatron magnet tilt meters detected the 8.9 magnitude earthquake off the coast of Japan