April 11-13

– Two stores provided ~16.75 hours of luminosity
– MI personnel brought machine back from RF system trip
– Tevatron quenched during shot setup due to kicker prefire
– NuMI beam permit tripped due to Lambertson power supply high temperatures
– MI LCW tripped off and caused the loss of the Recycler stash
– Store 8641 quenched due to kicker prefire
– Tevatron kickers put in conditioning mode
– Kicker personnel repaired Recycler kicker

Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts