– Three stores provided ~22.75 hours of luminosity
– NorthStar isotope experiment installed in MI-8 line for a three day run
– Cryo system technicians overhauled two Tevatron wet engines
– Store 8787 quenched due to a computer problem that moved collimators into the colliding beams
– Linac chopper repaired
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts