– The MI phasing controller still causing problems
– Tevatron Electron Lens (TEL) front end work completed
– MiniBooNE conducted air pressure test of MI-12 service building
– Meson water-to-air cooling tower problems
– Tevatron personnel conducted hollow beam collimation
– Pbar Debuncher Lens LCW flow meter problem discovered
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts