June 20-21

– Four stores provided 44.25 hours of luminosity
– NuMI personnel conducted target scans
– Booster beam tripped off when an RF equipment rack lost its power
– Proton Source beam suffered from Booster west anode power supply trips
– Interlock technicians began conducting safety system tests of the accelerators
– Tevatron personnel conducted luminosity leveling studies
– NuMI reports possibly finding the cause of its helium leak

Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts