June 24-27

– Four stores provided ~ 59.07 hours of luminosity
– Pbar vault exhaust fan repaired
– Store 8836 aborted due to Tevatron LCW problem
– MTA took beam
– I- Source tripped off due to water resister water skid trip
– Linac off due to LRF3 & 4 power amplifier troubles
– RF personnel repair BRF12
– Tevatron abort due to heater firing unit failure
– Linac off due to door interlock fault, followed by Linac safety system testing