June 3-6

– Five stores provided ~67 hours of luminosity
– Kicker trip during transfer caused loss of antiprotons
– Booster and MiniBooNE had problems due to high temperatures that reduced their intensities
– MTA taking beam
– The Booster NorthStar experiment ended on Sunday morning

*The integrated luminosity for the period from 5/30/11 to 6/6/11 was 63.63 inverse picobarns.

Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts