– Three stores provided 31.5 hours of luminosity
– Pbar Kicker personnel repaired abort kicker
– Store 8927 quenched due to CDF beam abort
– Main Injector and NuMI down for (V108) cable pulls
– Linac personnel repaired RF station (LRF3)
– Pbar accessed to clean clogged fan exhaust on Debuncher RF cavity (DRF3)
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts