July 6-8

– Three stores provided ~30.75 hours of luminosity
– MI kicker (I:KPS5S) repaired
– Relay replaced for Tevatron sector D3 LCW pump
– Pbar safety system testing completed
– Tevatron kicker E48 problems began
– FESS reported problems with Tevatron sector C3 pond water pump
– Stash lost due to MI-60 LCW pumps tripping off
– Run coordinator allowed access for Tevatron vacuum work and CDF and DZero access for Tevatron kicker work for a NuMI target scan. Access was also allowed for Booster studies and for a thermal scan of the MI-60 LCW pump motors and breaker panels