July 8 – July 11

– Four stores provided ~33.25 hours of luminosity
– NuMI conducted a target scan and found water in their target. NuMI is off for about 2.5 weeks for a target change
– Since the Tevatron needed vacuum work, much of the Accelerator Complex conducted maintenance during the day shift on 7/8/11
– MI suffered from coalescing and damper problems
– MiniBooNE off due to high temperatures in the MI-12 service building
– Stash lost on 7/11/11 due to lightning strike
– Run coordinator allowed Tevatron heat exchanger work and other jobs during the day shift that would not hinder stacking and stashing