– One store provided ~12.75 hours of luminosity
– NuMI magnet cabling work continued
– The main accelerator safety system dropped
– The master substation and Kautz Road substation lost power due to ComEd power lines going down in storm
– Many accelerator devices had to be replaced or repaired
– Tevatron cryo and vacuum systems recovery continued
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts