– Antiproton Source personnel conducted reverse proton studies
– Booster personnel conducted studies
– FESS replaced MTA’s faulty breaker trip unit
– MiniBooNE horn power supply’s ground fault limit adjusted back to nominal
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts