– A Main Injector beam valve closed and held off beam to FTBF experiment T-978
– Water Group personnel repaired a Linac Klystron RF station water leak
– Operators valved out a Linac sensor that had a split water hose
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts