– Linac personnel changed solenoid power supply
– NuMI personnel accessed their absorber room and cleaned a water skid filter
– Muon personnel conducted studies
– MTA took beam
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts