– Neutron Therapy Facility treated patients
– Antiproton Source personnel conducted Mu2e studies
– FTBF experiment T-1015 took beam
– ComEd power glitch tripped off Linac, Booster and Main Injector equipment
– Vacuum pumps tripped off in 8 GeV line
– Starting today, the Antiproton Source Department will be known as the Muon Department
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts