– Booster, Main Injector and muon rings personnel conducted studies
– Booster kicker personnel repaired a kicker that was holding off beam to Switchyard
– Operators made adjustments to the I- Source arc current
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts