– The Main Injector LCW system was reconnected to CUB
– The EDIT School resumed taking beam
– Power Supply personnel repaired the Main Injector MI-30 quadrupole magnet power supply
– Linac personnel repaired a Linac RF station
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts