– The EDIT School took its last beam
– Water Group narrowed the cause of the Main Injector water leak
– FTBF experiment T-979 took beam
– Operators conducted 750 KeV line and Booster injection tuning
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts