– Linac’s hot water system pump failed; backup brought online
– Booster and Muon Rings personnel conducted studies
– FTBF experiment T-1018 completed its run
– The seven-day shutdown to replace a Main Injector quadrupole magnet began
Read the Current Accelerator Update
Read the Early Bird Report
View the Tevatron Luminosity Charts