Above the ceiling at IARC

Pipes, duct work and electrical lines are currently being installed at IARC. Photo: Cindy Arnold

Above-ceiling mechanical, electrical and plumbing work is well under way inside the IARC OTE Building. Storm drains, sprinkler pipes, duct work, electrical lines and toilet room pipes can all be seen in this picture of the 3rd floor.