Elevator installation at IARC

Workers are installing elevator equipment at the IARC OTE Building. Photo: Ron Foutch

Interior construction is quickly moving along in the IARC Office, Technical and Education Building. Elevator equipment installation is taking place at the double elevator bank on the west end of the building. A third elevator will be installed on the east end. The east elevator will have front and back doors so that it can provide access onto the CDF main floor area.