Batavia Road and east gate closed through Aug. 1

In conjunction with the temporary closure of Fermilab’s east entrance, Fermilab’s asphalt subcontractor will pave both Batavia Road and the bike path from Eola Road to the railroad tracks. This work will proceed through Aug. 1 or, in the event of weather delays, through Aug. 2.

Workers will control traffic traveling to and from the Village area, and there may be some traffic delays. This work will be coordinated with the railroad track repairs. Both Batavia Road and the east entrance will reopen either Friday, Aug. 2, or Saturday, Aug. 3, at 6:30 a.m.