Batavia Road entrance closed July 30 – Aug. 1

The Batavia Road entrance to the laboratory will be closed tomorrow, July 30, at 6 a.m. to accommodate repairs to the Canadian National Railroad track crossing. It will reopen on Friday, Aug. 2, at 6:30 a.m. Vehicles entering or exiting the site should use the Pine Street entrance during this time.

If weather conditions delay construction work, the entrance closure may be extended through Friday, Aug. 2. In this case, the entrance will reopen on Saturday, Aug. 3, at 6:30 a.m.