Framing IERC May 19, 2021 | Brian Rubik Here, structural steel is being erected for the new Integrated Engineering Research Center, or IERC, building. In April 2021, the IERC team completed the steel structure for the new building. Photo: Brian Rubik Tagged: construction, IERC