July 6-8 road closure for work on South Booster Road

As part of the Accelerator Campus Utility Corridor project, South Booster Road will be closed Tuesday July 6, 2021 at 7 a.m. through Thursday July 8, 2021 at 5 p.m. between Indian Creek Road and Main Ring Road.

Traffic around the Wilson Hall Ramsey Horseshoe will be bi-directional between Tuesday July 6, 2021 at 7 a.m. through Thursday July 8, 2021 at 5 p.m.

Traffic seeking to enter Main Ring Road shall enter via the Wilson Hall crossover at A0 Parking Lot, or via E Road. Traffic seeking to exit Main Ring Road shall exit via E Road. Travel through this area will need to detour around the Main Ring Road to their desired location.

Additionally, access to the South-east Booster Tower Parking Lot and CUB access will be periodically interrupted Thursday July 8, 2021.

Access to Indian Creek Road will be available throughout this work.

We apologize for the inconvenience and thank you for your patience.