HWR back to APS-TD after test in PIP2IT

A large gray cuboid that is tank-like in appearance sits on the trailer of a semi truck in a loading dock with the bay door open. A person is on the right of the truck. Two masked people wearing hard hats and physically distanced stand to the left of the truck as well.

After successfully accelerating beam in PIP2IT, the half-wave resonator cryomodule was transported back to APS-TD ICB, where it will be prepared for long-term storage before installation in PIP-II. Photo: Cristian Boffo