PIP-II Cryogenic Plant Building construction

The frame of a building, with the lower half wrapped in yellow paper, sits behind a body of water surrounded by grass. Blue sky behind.

In June 2021, construction of the PIP-II Cryogenic Plant Building continues on the Fermilab campus. Photo: Ernesto Alcaraz

Photo of the frame of a building covered in a see-through white material on the upper floor and yellow paper on the lower floor. Scaffolding on the left side of the building. It sits on a sandy construction site with blue sky behind.

From another angle. Photo: Ernesto Alcaraz