What a difference (almost) a year makes for IERC, PIP-II

A parking lot, long body of water, some sand from construction, some construction equipment, mostly grass.

From the eighth floor of Wilson Hall, the IERC (foreground) and the PIP-II construction site (background) in September 2020. Photo: Ken Herner

Same point of view, now with much of a building constructed in the upper right-hand corner, and the roof of a nearby building in the lower left foreground.

The same perspective in August 2021 offers a much different view. Photo: Ken Herner