Starting Monday, May 22 through Friday, May 26, ISD Engineering will be performing a Road Conditions Study at multiple locations lab wide. Traffic will be maintained for the duration of the operation. Please use an abondance of caution when approaching the designated work zone. As always we apologize for any inconvenience this may cause.