HWR back to APS-TD after test in PIP2IT July 12, 2021 | Cristian Boffo After successfully accelerating beam in PIP2IT, the half-wave resonator cryomodule was transported back to APS-TD ICB, where it will be prepared for long-term storage before installation in PIP-II.