parking

As a part of the IERC’s site prep project, the Wilson Hall east drive closure will progress to the south. This work will temporarily affect access to the Wilson Hall loading dock. The loading dock’s southern bay will remain open all week, the northern bay will be closed on Thursday, Feb. 28 and Friday, Feb. 29.  As always, thank you for your continued patience.

From Monday, Feb. 17, through Saturday, Feb. 22, FESS-E will be closing the Wilson Hall east parking lot to through traffic.  The Ramsey horseshoe will remain open with a two-way traffic pattern. Please reference the traffic plan in the link below. 2020-02-13_5e4596861033c_IERCRoadClosurePlanComP103-17-2020  

FESS will be closing the Wilson Hall east parking lot to thru traffic on Saturday, October 5, from 6:30 a.m. to 3:00 p.m. The closure will facilitate the installation and tie-in of the new ICW main. We greatly appreciate your patience and apologize for any inconveniences this may cause.

Site preparation work for the Integrated Engineering Research Center is scheduled to begin Monday, August 12. At that time, both the Wilson Hall east parking lot and the pedestrian bridge from the east parking lot to the A0 parking lot will close. A portion of the A0 parking lot will close temporarily. The bike/pedestrian path along the east reflecting pond will be rerouted around the front of Wilson Hall. With the closing of the WH east lot, as well as…

On Saturday November 3rd the Wilson Hall East parking lot and Ground Floor East building entrance will be closed from the hours of 6:30AM until 4:00PM.  This closure is being executed by FESS-Engineering in order to perform exploratory soil borings as a part of the IERC Design.  Our apologies for the temporary inconvenience.   2018-10-30_5bd8a07eb6a21_IERCSoilBorings10-27-2018