10-0228-20D-high

Construction crews are altering the existing New Muon Building to make the facility capable of producing and testing key components for superconducting radio frequency technology. They are building an underground enclosure and support housings. Technical beamline equipment will occupy the length of the existing facility and the 202-foot extension. The project will also include work inside the existing building to relocate the loading dock to accommodate the new tunnel enclosure.