Taken from the 15th floor of Wilson Hall, this photo provides a distant view of the site preparation for the construction of the Fermilab-based portion of the Long-Baseline Neutrino Facility, beyond the Muon Campus (in foreground). The site prep work is visible in the center of the photo, just above the tree line, adjacent to the Main Injector ring. Photo: Ryan Postel, Fermilab