LBNF pre-excavation work

Workers will rehab this old tramway tunnel near the surface and install a conveyor system that will transport rock from the rock crusher to its final location in the Open Cut. Credit: Fermilab

Workers will rehab this old tramway tunnel near the surface and install a conveyor system that will transport rock from the rock crusher to its final location in the Open Cut. Credit: Fermilab