This photo shows the construction site from above the old portal. When complete in 2020, the conveyor system will extend down the hill and begin moving rock to the Open Cut. Credit: Fermilab
This photo shows the construction site from above the old portal. When complete in 2020, the conveyor system will extend down the hill and begin moving rock to the Open Cut. Credit: Fermilab