Ainsworth will install two systems for testing beam instabilities in the Fermilab Recycler, a three-kilometer-circumference storage ring, seen here. Later, he will install them in a separate facility, the Integrable Optics Test Accelerator. Photo: Reidar Hahn, Fermilab