The marked area in this aerial photo of the Main Injector accelerator ring, taken in 2016, marks the area where most of the site preparation work takes place. One of the tasks was to drain and fill in the cooling pond. The yellow arrow indicates the direction of the future LBNF/DUNE neutrino beam. Photo: Reidar Hahn, Fermilab