20071213_464midnightride1-hr

The CMS tracker at CERN traveled Wednesday, Dec. 12, from the Meyrin site to Point 5. It traveled at night to minimize traffic impact. The Tracker was lowered into the cavern Thursday, Dec. 13, and will be installed into CMS on Saturday, Dec. 15. Image courtesy Michael Hoch, Adventure Art.