tevatron-800-gev-11-0226-01d-hr

On Wednesday, Feb. 15, 1984, an 800-GeV ramp was set up in the Tevatron and achieved by 6:30 p.m. after two quenches. The Tevatron then accelerated and extracted beam to 800 GeV by 10:54 p.m.