Author Archive

Please be advised, IERC project has scheduled a road closure at the new A0 Berm Crossover for this Saturday 9/19 & Sunday 9/20 from 7:30AM to 5:30PM.  The Ramsey Horseshoe will be temporarily reconfigured to accommodate two way traffic for the day.  The Wilson Hall Loading Dock will remain accessible throughout this operation.  Please make any necessary travel adjustments to maintain continuity of operations that may be required.  We apologize for any inconvenience this may cause. IERC Road Traffic Plan…

Please be advised: IERC project has scheduled a Wilson Hall building wide power outage for this Saturday, Sept. 12, from 7:30 a.m. to 7:30 p.m. Please make any necessary adjustments to maintain continuity of operations that may be required. We apologize for any inconvenience this may cause.

Water Coolers

As you are returning to your buildings and offices, please be aware that the local water cooler has been sitting stagnant since you last occupied your building.  Please discuss with your building manager the need to have the water cooler flushed and cleaned by Clorica to eliminate any algae or mold that might have accumulated in your absence.   

As a part of the IERC site prep project, the Wilson Hall east drive closure will be closed Thursday March 12th through Monday March 16th. This work will temporarily impact access to the Wilson Hall loading dock. The loading dock’s northern and south bays will be closed to vehicular access until Monday March 16th.  As always, thank you for your continued patience.   IERC Road Closure Plan (Com P4 03-12-2020)